Schneider Electric Connects Container Ships to Shore Power Electrical in Vancouver

Schneider

Jan 11, 2019

A Schneider Electric Canada Inc. solution chosen by the Vancouver Fraser Port Authority is reducing greenhouse gas (GHG), air emissions and noise from ships while docked at the port’s Centerm Container Terminal.

The solution, a Schneider Electric EcoStruxure Platform design, allows docked ships to shut down their engines and be powered using a “plug-in” electrical shore power connection. Shutting down the engines helps to reduce air pollution. The shore power capability also qualifies a ship for the Vancouver Fraser Port Authority’s EcoAction program, providing discounted harbour dues and the opportunity to be recognized with a Blue Circle Award. The system was successfully commissioned and connected to the first ship on October 15, 2018.

The shore power solution is operated by DP World Vancouver. The standards-compliant system was designed and commissioned by Schneider Electric Canada Inc. and PBX Engineering of Vancouver, and installed by Houle Electric. The solution relies on clean electricity from BC Hydro to power the ships, which allows them to shut down their diesel engines. The project was made possible through the vision and environmental stewardship of the Vancouver Fraser Port Authority and through funding support from Transport Canada.

“As Canada’s largest and busiest port, we must balance growth in trade with the need to protect our environment and respect the quality of life of our neighbours,” says Tom Corsie, Vice President Real Estate of the Vancouver Fraser Port Authority. “Shore power is just one of the ways we are working towards improving air quality and reducing marine shipping emissions. Over 60 hours of shore power use, one large container ship will reduce its greenhouse gas emissions by an anticipated 95 tonnes and save about 31 tonnes of fuel. This not only helps the environment, but also positions British Columbia’s trade sectors to take advantage of growth opportunities and ensure our competitiveness in this market.”

The Schneider Electric design was chosen due to its local presence, technical expertise and proven experience within the marine shore power arena.

“As part of our continued focus on sustainability and green power solutions, we at Schneider Electric Canada are very proud of the shore power solution at the Port of Vancouver terminal and the impact it will have to reduce greenhouse gases, air emissions and noise,” says Susan Uthayakumar, president of Schneider Electric Canada Inc. “This reinforces our global vision to be recognized as a leader in environmental sustainability.”

EcoStruxure is Schneider Electric’s open, interoperable, IoT-enabled system architecture and platform. EcoStruxure has been deployed in 480,000+ sites, connecting over 1.6 million assets under management through 40+ digital services.

Related Articles


Changing Scene

  • AEA Congratulates Leanne Walker for Emerging Leader Award at 2024 AEA Industry Awards

    AEA Congratulates Leanne Walker for Emerging Leader Award at 2024 AEA Industry Awards

    Recently, the Alberta Electrical Alliance (AEA) congratulated Leanne Walker of EECOL Electric for receiving the Emerging Leader award at the 2024 AEA Industry Awards. The AEA colleague, Jaye, had this to say about Leanne’s years in the business: “Leanne is a highly valued member of our team and consistently demonstrates professionalism in the industry. Leanne… Read More…

  • AD Names 2025 LLC Board of Directors After Owner/Member Vote

    AD Names 2025 LLC Board of Directors After Owner/Member Vote

    AD announced that its owner/members elected three directors to its LLC Board of Directors and an appointment. AD directors are elected through an annual voting process during which the AD Board’s Nominating & Governance Committee reviews nominations submitted from the membership at-large and AD owner/members vote on the nominees proposed to join the Board. Read More…


Peers & Profiles