Sonepar Launches First Cable Cutting Automation in North America

October 16, 2024

Sonepar announced the inauguration of the electrical industry’s first Automated Cable Cut and Automated Storage and Retrieval System, (ASRS) in North America.

This technology has been implemented into Lumen’s, a division of Sonepar Canada Inc., Central Distribution Centre (CDC) located in Laval, QC.

“The new cable cutting automation enables Lumen to continue its primary business model, which is providing our customers with next day service,” said Lumen President, Serge Leblanc. “The technology supports Lumen’s future growth and productivity, by managing our increasing volume of inventory, fully automating the picking, and introducing conveyer transport with ASRS. Overall, the transformation has doubled our cable cutting capabilities.”

To support the integration of the new automation system Lumen remodelled it’s CDC and expanded the facility by an additional 180,000 sq ft. The CDC now measures at a total of 565,000 sq ft. and features; a 60 foot tall racking system, eight cable cutting machines, five cranes and over 3800 new storage locations with the capacity to store 3-tonne cable reels.

Lumen’s new cable automation project is a part of Sonepar’s global transformation goal of deploying state-of-the-art logistics through 70 fully automated warehouses by 2026. To achieve this, Sonepar has prioritized strengthening and securing the IT infrastructure, focusing on the ecommerce wing of the business, and investing in the global supply chain.

Source

Related Articles


Changing Scene

  • Arlington Wins NECA 2024 ShowStopper Award for Outstanding Product

    Arlington Wins NECA 2024 ShowStopper Award for Outstanding Product

    A 2024 NECA ShowStopper Award was awarded to Arlington’s Furred Wall Box Kits at the 2024 NECA Show on September 29 in San Diego, CA. Arlington’s Furred Wall Box Kits make challenging outlet box installations easy. There’s no need to break out concrete block, install furring strips, or foam around the box. UL Listed, large… Read More…

  • Growing Demand for Resilient Grid Solutions Drives S&C’s Latest Expansion

    Growing Demand for Resilient Grid Solutions Drives S&C’s Latest Expansion

    S&C Electric Company officially opened its new 275,000-square-foot manufacturing facility in Palatine, Illinois. S&C innovates and manufactures technology that advances a more intelligent, resilient, and reliable electrical grid. The Palatine expansion, announced in early 2023, created 200 production and engineering jobs and is approximately 25 miles from S&C’s 47-acre headquarters and manufacturing campus in Chicago’s Rogers Park… Read More…


Peers & Profiles